ENIGINEERING OFFICE OF OM DOYOK
STORY2 Introduction of Son La Hydropower Project


The Son La Hydropower Project is the largest hydropower development scheme in Vietnam currently under construction. It is located approximately 250 km northwest of Hanoi, and about 190 km upstream of the existing Hoa Binh Hydropower Project on the Da River which is the largest tributary of the Red River. The Red River originates in the mountainous areas of Yunnan, China.

The Red River is formed by the confluence of three rivers: the Thao, the Da, and the Lo. The flow of the three rivers is characterized by tropical monsoon rains and coincides with high summer floods on these rivers sometimes resulting in disastrous flooding of the Bakbo plain around the Red River delta where Hanoi, the capital of Vietnam having more than 2.7 million inhabitants, is situated. Consequently, the flood control of the Red River in the wet season is one of the main goals of the Project. The flood control volume of the Son La reservoir and the Hoa Binh reservoir is 7.0 billion m3 in total.

Once the Son La Project is put in operation, the flow will be firmed up and the base flow will be stabilized. This will significantly improve the downstream flow regime in the dry season. The achievement of improved water supply in the dry season for the Red River delta is also one of the main goals of the Project. Namely, the full supply level (FSL) at El. 215m of the Son La reservoir having an active storage capacity of 5.97 billion m3 gives an option for downstream water supply in the dry season for the Red River delta.

Salient Features of Son La HPP are as tabulated below.

No.DescriptionsParticularsData
1HydrogyCatchment Area43,760 km2
Mean Flow1,532 m3/s
Peak Flood Flow(P=0.1%)28,600 m3/s
2ReservoirPropbable Max. Flood LevelEL. 228.07 m (PMF)
Surcharge LevelEL. 217.83 m (modified P=0.01%)
Full Supply LevelEL. 215.0 m
FWL (flood waiting level)EL. 194.08 m
Min. Operation levelEL. 175.0 m
Full Capacity9260x106 m3
Effective Storage6504x106 m3
Flood Preventive Storage4000x106 m3
3DamTypeGravity Concrete (RCC + CVC)
Crest EvelvationEL. 228.1 m
Max. Height138.1 m
Crest Length

962 m

4SpillwayProbable Food Discharge38,240 m3/s (P=0.1% PMF)
Bottom Outlet12 nos. x (6.0mW x 9.6 mH) orifice, Sill level EL. 145.0m
Radial Gates with Hydraulic Hoists
Surface Spillway6 nos. x (15.0mW x 11.46mH) orifice, Ogee crest level EL. 197.8m
Radial Gates with Hydraulic Hoists
Spillway dam height93.1 m
Transverse joint spacing38.5 m
Chute channelSymmetrically flared open channel with terminal flip bucket
5IntakeTypeBell-mouth inlet with vertical removable trash rack
Centre line levelEL. 156.0m
Quantities6 nos. each for one generating unit
Inlet spacing (c to c)31.5 m
Dam joint spacing31.5 m
Trash rack for each inlet2 sets x (11.5mW x 31.5mH)
Penstock6 Lanes, Diameter 10.5 m
6PowerhouseGeneration capacity6 x 400 MW = 2,400 MW
Design discharge6 x 573 m3/s = 3,438 m3/s
Rated net head78.0 m
Unit spacing31.5 m
Concrete joint spacing31.5 m
Bottom of draft tubeEL. 81.0 m
Turbine distributor centreEL. 105.0 m
Powerhouse yard groundEL. 138.0 m
Type of TurbineVertical Shaft Francis
Speed90.0 rpm
Max. tail water levelEL. 136.95 m (PMF)
Tail bayOpen channel with upward bottom slope (1:3)
7Diversion systemChannel90 m wide open channel with bottom level of El.110m
Double box culvert (2 x 12m W x 13m H)

This project is located at cordinate of N 21o30', E 104o00'. You may not googling the map. Only you can find a areal photo before construction.

Longitudinal section of spillway and intake/powerhouse at flow direction is here. General Plan is here .

Photo below show the general view of the project on April 29, 2008 from the left bank side. Da river flows left to right in the photo.

Intake and powerhouse are located at the left bank side. Spillway is located at right bank side.

The dam is constructed in RCC (Roller Compacted Concrete). You can see several lanes of belt conveyor systems for transporting concrete for RCC.

General View on April 29, 2008from Left Bank

General View from Downstream (May 11, 2008)

To top Page Next page