水門と鉄管の諸元は次のようになっている。位置関係は Engineering Office - 2 からリンクした図面を参照のこと。
| Item No. | ||||||
| Location | Spillway | |||||
| Particulars | Unit | Maintenance Emergency Gates (Upper) | Surface Radial Gates | Maintenance Emergency Gates (Lower) | Bottom Radial Gates | |
| (Spillway Service Gate) | Spillway Radial Gate | (Bottom Outlet Service Gate) | (Bottom Outlet Radial Gate) | |||
| Q'ty | ||||||
| Gate Leaf | (set) | 1 | 6 | 2 | 12 | |
| Guide Frames | (set) | 6 | 6 | 12 | 12 | |
| Hoist | (set) | 0 | 6 | 0 | 12 | |
| Local Control Panel | (set) | 0 | 6 | 0 | 12 | |
| Gates and Guide Frames | ||||||
| Type | Fixed Wheel Gate (6 seg) | High-pressure Radial | Fixed Wheel Gate (5 seg) | High-pressure Radial | ||
| Clear Span | (m) | 15.00 | 15.00 | 6.00 | 6.00 | |
| Clear Height | (m) | 21.00 | 11.46 (R17.5) | 16.00 | 9.60 (R17.5) | |
| Seal | 4 at D/S | 4 at U/S | 4 at D/S | 4 at U/S | ||
| Design WL (normal) | (m) | |||||
| Design WL (seismic) | (m) | |||||
| Sill EL | (m) | 195.50 | 197.54 | 145.00 | 145.00 | |
| Design Head for Gate | (m) | |||||
| Top EL of Guide Frames | (m) | 228.10 | N/A | 228.10 | N/A | |
| Max. Rated Discharge | (m3/s) | |||||
| Hoists | ||||||
| Type | Gantry Crane | Hydraulic | Gantry Crane | Hydraulic | ||
| Hoisting Height | (m) | N/A | N/A | N/A | ||
| Hoisting | (m/min) | N/A | N/A | N/A | ||
| Operation Head (Open) | (m) | N/A | N/A | N/A | ||
| Operation Head (Close) | (m) | N/A | N/A | N/A | ||
| Operation | N.A | N/A | N/A | N/A | ||
| Item No. | ||||
| Location | Spillway | |||
| Particulars | Unit | Gantry Crane | Assembling Crane | |
| Q'ty | ||||
| Crane | (set) | 1 | 1 | |
| Local Control Panel | (set) | 1 | 1 | |
| Specs | ||||
| Type | Steel | Steel | ||
| Rail Span | (m) | 8.50 | 21.60 | |
| Capacity | (ton) | 350/10 | 125/20 | |
| Hoisting Height | (m) | |||
| Traveling Length | (m) | |||
| Hoisting | (m/min) | |||
| Traveling | (m/min) | |||
| Item No. | ||||||
| Location | Intake | Powerhouse | ||||
| Particulars | Unit | Emergency Maintenance Gates | Maintenance Gates | Downstream Gate | Remarks | |
| (Intake Gate) | (Intake Service Gate) | (Drafttube Gate) | ||||
| Q'ty | ||||||
| Gate Leaf | (set) | 12 | 12 | |||
| Guide Frames | (set) | 12 | 12 | 12 | ||
| Hoist | (set) | N/A | N/A | N/A | ||
| Local Control Panel | (set) | N/A | N/A | N/A | ||
| Gates and Guide Frames | ||||||
| Type | FWG | Slide | ||||
| Clear Span | (m) | 6.25 | 6.75/6.65 | 10.80 | ||
| Clear Height | (m) | (11.19) | (10.95) | 9.60 | (Gate Height) | |
| Seal | 4 at D/S | 4 at U/S | 4 at U/S | |||
| Design WL (normal) | (m) | |||||
| Design WL (seismic) | (m) | |||||
| Sill EL | (m) | 150.24 | 150.71 | 83.20 | ||
| Design Head for Gate | (m) | |||||
| Top EL of Guide Frames | (m) | 180.10 | 180.10 | 136.20 | ||
| Max. Rated Discharge | (m3/s) | |||||
| Hoists | ||||||
| Type | Gantry | Gantry | Gantry | |||
| Item No. | |||||
| Location | Intake | Tailrace | |||
| Particulars | Unit | For Trashracks | For Gates | ||
| Q'ty | |||||
| Crane | (set) | 1 | 1 | 1 | |
| Local Control Panel | (set) | 1 | 1 | 1 | |
| Specs | |||||
| Type | Gantry Crane | Gantry Crane | Gantry Crane | ||
| Rail Span | (m) | 9.15 | 9.15 | Not Clear | |
| Capacity | (ton) | 2@125/2@20+10 | 330/10+5 | Not Clear | |
| Hoisting Height | (m) | ||||
| Traveling Length | (m) | ||||
| Hoisting | (m/min) | ||||
| Traveling | (m/min) | ||||
| Item No. | ||||
| Location | Intake | |||
| Particulars | Unit | Trashracks | Remarks | |
| Q'ty | ||||
| Trashrack Panels | (sets) | 12 | 11 segement/set | |
| Guide Frames | (sets) | 12 | ||
| Lifting Beam | (sets) | 1 | ||
| Guide Franes for spare panels | (sets) | |||
| Trashrack cover | (set) | 12 | ||
| Specs | ||||
| Type | Steel | |||
| Clear Span | (m) | 11.50 | ||
| Vertical Height | (m) | 31.50 | ||
| Panel Height | (m) | |||
| Gradient | Vertical | |||
| Slant Length | (m) | N/A | ||
| Bar Pitch | (m) | 0.15 | ||
| Design Head | (m) | |||
| Max. Rated Discharge | (m3/s) | |||
| Sill EL. | (m) | 141.50 | ||
| Top EL. Of guide frame | (m) | 228.10 | ||
| Page in Drawing Book | 45, 46 | |||
| Penstock | |||
| Quantity | 6 lanes | ||
| Spec | Length | 118.503 m | (Excluding inlet conduits) |
| Diameter | 10.500-9.400 m |
誰が設備の名前を決めたかは知らないが、命名するときのセンスがまるでない。普通は設備の名称だけでその構造と果たすべき機能が想像できるのであるが、このプロジェクトに限っては、命名方法が常識外の「さらに外」といえる。それ故、もともとの名称では混乱する可能性があるので名前を付け替えたのである。
この中のどの設備がどこの業者とすでに契約されているか、あるいは未契約なのか、各設備の設計、製作、輸送、据付がどの契約に何が含まれてるのかがまったく分からないことだ。何もそんなに秘密裏にしなくてもよさそうなものなのに、つっついてもプロジェクト側からは何の音沙汰もない。
また、工事監理には欠くことのできない工程表も「ない」。とんでもない昔に大臣が承認したという全体工程表があるだけで、毎日の作業進捗を見ることは全くできないのである。契約状況情報と共に工程表に関しても何度も情報提供の依頼をしているが、「なしのつぶて」である。
工事監理に必要不可欠な工程表がなくては工程管理ができないのであるが、それがちっとも分かっていないように思える。瑣末な書類が多く、プロジェクトの担当者たちはその作業に忙殺されているようにも見えてしまう。
この現況を見て、ホーおじさんなら何て言うだろうかとベトナム人たちは想像したことがあるのだろうか。
やはり40年間の「主義」のツケがここに現れてきているのであろう、と疑り深いこの「海千山千」にはどうしてもおもえてしまうのである。
この写真の「ちょっとメタボ」がこのページを開設している「海千山千」なのである。近くで見ても美しくないのでこの程度の写真に留めておく。
| エンジニアリングのトップへ戻る | 進む |
2008-05-09 作成
スカム防止のために画像ファイルになっています。お手数ですがメールの宛先は手でご記入ください。
![]()
| このページは、2019年3月に保存されたアーカイブです。最新の内容ではない場合がありますのでご注意ください |